Acrylic and polyurethane paints


Car paint ready base metallic 1:1 - Polaron Acryl/C1 Base Metallic

Packing: 1 l

Apply: 2-3 layers, every 15-20 min.

Drying: 5-20 min in 20°C, before applying the varnish

Car paint ready base metallic 1:1 - Polaron Acryl/C1 Base Metallic

Packing: 1 l

Apply: 2-3 layers, every 15-20 min.

Drying: 5-20 min in 20°C, before applying the varnish

Acrylic car paint WHITE/BLACK/RED/GREEN BASE 1:1 - P-Acryl/C1 Basecoat

Packing: 1 l & 3.5 l

Apply: 2-3 layers, every 15-20 min.

Drying: 5-20 min in 20°C, before applying the varnish

2K Acrylic paints 2:1 - Polaron-Acryl Solid Color Top Coat

Packing: 1 l

Apply: 2 layers, every 5-10 min.

Drying: 8h in 20°C, or 30 min. at 60°C

2K Acrylic BLACK & WHITE paint - Polaron Acryl 2K Ultra White 001/2K Black

Packing: 1 l - 3.5 l

Apply: 2 layers, every 5-10 min.

Drying: 8h in 20°C, or 30 min. at 60°C

Acrylic primer HS - Joker (5+1) WHITE - Polaron p-PRIMER 5+1 HS - JOKER

Packing: 1 l

Apply: 2 layers, every 5-10 min.

Drying: 8h in 20°C, or 30 min. at 60°C

Acrylic primer HS - Joker (5+1) GREY - Polaron p-PRIMER 5+1 HS - JOKER

Packing: 1 l - 2.5 l

Apply: 2 layers, every 5-10 min.

Drying: 8h in 20°C, or 30 min. at 60°C

Acrylic primer HS - Joker (5+1) BLACK - Polaron p-PRIMER 5+1 HS - JOKER

Packing: 1 l - 2.5 l

Apply: 2 layers, every 5-10 min.

Drying: 8h in 20°C, or 30 min. at 60°C

a-Hardener for Acrylic Primers HS - Joker 5+1 WHITE/GRAY/BLACK a-HARDENER-FAST

Packing: 0.2 & 0.5 l

Apply: 1 normal layer, or 1 thin and 1 normal layer every 10-15 min.

Drying: 8h in 20°C, or 30 min. at 60°C

2K Acrylic HS Primer - 4+1 GRAY/BLACK/WHITE Polaron e-PRIMER 4+1 HS 2K

Packing: 1 l

Apply: 2 layers, every 5-10 min.

Drying: 8h in 20°C, or 30 min. at 60°C

a-Hardener for 2K Acrylic HS Primer - 4+1 GRAY/BLACK/WHITE Polaron e-HARDENER 4+1

Packing: 0.2 & 0.5 l

Apply: 1 normal layer, or 1 thin and 1 normal layer every 10-15 min.

Drying: 8h in 20°C, or 30 min. at 60°C

Acrylic Thinner - FAST - Polaron T 8-18 Acrylic FAST Thinner

Packing: 1 l & 3 l

Apply: 2 layers, every 5-10 min.

Drying: 8h in 20°C, or 30 min. at 60°C