Industrial floor coverings


Two-component moisture-repellent epoxy primer for concrete - REAL WET 365

Packing: A com: 3.6 kg + B com: 1.4 kg & 11.5 kg + B com: 4.5 kg

Expense: 300 g/m2 per layer

Drying: 4-6 days at 20°C

Transparent, UV-resistant, 2K epoxy binder for stone carpets - REAL QCF

Packing: A com: 3.35 kg + B com: 1.65 kg & A com: 10.05 kg + B com: 4.95 kg

Mixing: 7% per kg stones 2-4mm

Drying: 4-10 days at 20°C

2K, UV-resistant polyurethane varnish for concrete and stone - Glossy - REAL VARNISH 100

Packing: A com: 4 kg + B com: 1 kg & A com: 12 kg + B com: 3 kg

Expense: 100 g/m2 per layer

Drying: 4-6 days at 20°C

Natural Colored Decorative Stone

Packing: 25 kg bags.

Expense: at 8mm - 19 kg.

Color: natural colored stones

Single component, water insolation, acrylic primer for concrete - REAL 800 1K

Packing: 15 kg. & 5 kg.

Expense: 150 gr./m2 per layer

Drying: 4-6 hours at 20°C

Two-component, transparent, epoxy primer for concrete - REAL RESIN360 1K

Packing: A com: 3.65 kg + B com: 1.35 kg & 13.14 kg + B com: 4.86 kg

Expense: 300 gr./m2 per layer

Drying: 2-7 days at 20°C

Two-component epoxy self-leveling floor coating - REAL SLF 116

Packing: A com: 16kg + B com: 4kg

Expense: 0.6 kg/m2 for the first layer and 1.6 kg/m2 for the second layer

Drying: 7 days at 20°C

Two-component, relief epoxy floor coating - REAL GRN 785 TX

Packing: A com: 17.2 kg + B com: 3.8 kg

Expense: 600 gr/m2 for the first layer and 550 gr/m2 for the second layer

Drying: 4-7 days at 20°C

Two-component, aliphatic polyurethane varnish – REAL PU 100

Packing: A com: 3.5 kg + B com: 1.5 kg & 10,5 kg + B com: 4.5 kg

Expense: 550 gr/m² per layer

Drying: 5-7 days at 20°C

Three-component epoxy repair compound for expansion joints and cracks - REAL GR 900

Packing: 15 kg. & 5 kg.

Expense: 550 gr./m2 per layer

Drying: 4-7 days at 20°C

3K epoxy paste resin for the repair of fine cracks - REAL GR 950

Packing: 15 kg. & 5 kg.

Expense: 550 gr./m2 per layer

Drying: 4-7 days at 20°C

2K self-leveling polyurethane joint sealant - REAL DC 985

Packing: 15 kg. & 5 kg.

Expense: 550 gr./m2 per layer

Drying: 4-7 days at 20°C